The Scope

Demolition works and De-commissioning of a centralized HVAC system
• Masonry
• Design and constructing of a De-centralized HVAC system.
• Upgrade of existing Distribution Board.
• Construction of Structural steel mezzanine floor
• Supply and installation of Industrial Kitchen Equipment.
• Supply and installation of Aluminum shopfronts.
• Supply and fitting of a reception counter, server counter and bulkhead.
• Supply and installation of a Grease trap.

Refurbishment of Simmer VLI Kitchen

South Africa

  • Type: Refurbishment
  • Status: Completed
  • Area: 14sqm
  • Budget: R18 344 200.00
  • Year: 2018